Construction Alert: HTML ADA Ramp
Tulane University and Boudreaux Nathan Builders will begin repairs to the HTML ADA ramp on Friday, February 12, 2021.
Expected Timeline: This project will begin Friday, February 12, 2021 and continue through Friday, February 19, 2021.
Anticipated Impact: Starting Friday, February 12, 2021, the Dixon side (right side) front ramp at Howard-Tilton Memorial Library will be blocked off to all traffic for minor repairs. During the duration of the project, patrons will need to use the Freret side (left side) front entrance to enter the library front doors. If ADA access is required, please use the Freret Street wooden ramp for access and call the number indicated on the signage for assistance getting into the building.